Installation Guide
Commercial Firework Light Installation: A Professional Guide
Phase 1: Site Preparation
Mark fixture positions (3-5m spacing), check for underground utilities, verify power availability. Each AC unit draws 60-120W.
Phase 2: Mounting
Three methods: ground stakes (soft ground), base plates (hard surfaces), weighted bases (temporary/indoor).
Phase 3: Wiring and DMX Setup
Daisy-chain with XLR cables. One DMX universe (512 channels) controls up to 64 units. Terminate last unit with 120-ohm resistor.
Phase 4: Testing
Test each unit individually, test group sync, verify fail-safe behavior, check waterproof connections.
Phase 5: Seasonal Maintenance
Monthly visual inspection, quarterly connector check, annual full system test. Keep 5% spare units.